> For the complete documentation index, see [llms.txt](https://docs.zipwire.io/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/units-and-daily-allowances.md).

# Units and Daily Allowances

How a Zipwire timesheet is laid out in billable units, why a half-day is half of the standard working day, and how a billing plan's daily allowance and weekend settings decide what can be billed.

A Zipwire timesheet doesn't list hours. It lists **units**: whole hours or half-days, depending on the [Billing Plan](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/billing-plans.md). This page explains how units are sized, how many fit in a day, and who decides how many can be billed.

## Reading the sheet

* **Each row is one day** of the billing period.
* **Green boxes are billed units.** On a half-day plan, each green box is one half-day.
* **The purple bar is the time actually worked**, shown against the units so you can see how well the work fills them.

## A half-day is half of the standard day

A half-day unit is **half of the plan's standard working hours**, not half of a 24-hour day. On the default 8-hour day (a 40-hour, 5-day week) a half-day is **4 hours**. On a 7-hour plan it's 3½ hours.

Many systems quietly treat a "half-day" as half of a calendar day, which makes a long day impossible to bill. Zipwire sizes units from the working day, so a day can hold as many units as fit into 24 hours:

| Plan                           | Unit length | Most units in one day |
| ------------------------------ | ----------- | --------------------- |
| Half-days, 8-hour standard day | 4 hours     | 6 (6 × 4h = 24h)      |
| Hourly                         | 1 hour      | 24                    |

This lets a contractor bill a genuinely long day, such as working through the night after an overnight outage, instead of being pushed to take time off in lieu. It also sets the smallest thing you can bill: **one unit**. On a half-day plan, a morning at work followed by an afternoon off (a dentist appointment, say) is one half-day.

## From journal to sheet

Contractors record real time in their private [Journal](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/the-journal.md), to the nearest 10 minutes. When a timesheet is created, that time is **poured into units** to fill the sheet:

* A unit that's mostly worked bills in full.
* Time that doesn't fill a unit, or time beyond what's billed on a day, isn't thrown away. It's carried forward within the sheet and can top up an under-filled unit later on, for example the next day.
* The aim is for worked and billed time to come out square by the end of the period.

The exact rules, with worked examples, are in [How Time Becomes Billed Units](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/how-time-becomes-billed-units.md).

Contractors can also **edit the sheet** and claim extra units by hand before sending it.

## The daily allowance is set by the billing plan

The billing plan, usually chosen by the client's accounts team, decides:

* **How many units are available each day.** Units the plan doesn't allow are marked **NA** and are never billed.
* **Whether weekends are billable.** A weekend marked NA is outside the plan.

### Uncapped: billing the real time

The most complete picture is **every unit available, every day**, including weekends. On a half-day plan that's 6 units a day. Whatever the contractor really works can be billed.

### Capped: billing up to a limit

A plan can instead cap the day, for example **two half-days a day, weekdays only**. Time is still poured into the allowed units in the same way. Work beyond the cap can't be billed:

* The contractor sees the time worked but not billed **further down their sheet**.
* That unbilled time is **not carried into the next sheet**. Each sheet settles on its own.

{% hint style="info" %}
**Choosing between the two** It comes down to incentives. Paying for actual time worked means long days get paid. A cap means time past the limit isn't paid, so contractors have less reason to work beyond the standard week.
{% endhint %}

## What each person sees

| Viewer                  | What they see                                                                                                                                     |
| ----------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------- |
| **Contractor (sender)** | Actual hours worked alongside the billed units, plus a line comparing worked time with what will be billed before sending                         |
| **Client / approver**   | The billed units. Activity bars are normalised to show **proportions** of work (for example development vs meetings), not the actual hours worked |

## Related Resources

{% content-ref url="/pages/mPusqHKhYTYbX0bwBKVG" %}
[How Time Becomes Billed Units](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/how-time-becomes-billed-units.md)
{% endcontent-ref %}

{% content-ref url="/pages/V6ToCyYJtjSrCKJbuDcw" %}
[Billing Plans](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/billing-plans.md)
{% endcontent-ref %}

{% content-ref url="/pages/HMQINGP6nnIrp2MV6EP0" %}
[Rate Plans](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/rate-plans.md)
{% endcontent-ref %}

{% content-ref url="/pages/PKj3BZaKOnX27f1uW1h3" %}
[The Journal](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/the-journal.md)
{% endcontent-ref %}
