> For the complete documentation index, see [llms.txt](https://docs.zipwire.io/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/how-time-becomes-billed-units.md).

# How Time Becomes Billed Units

How Zipwire turns the time you journal into whole billed units — the round-up, the running balance, and why the result is fair to both the contractor and the client.

Contractors work in minutes, but clients are billed in **units** — hours or half-days, as set by the [Billing Plan](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/billing-plans.md). Somewhere, real time has to be rounded into whole units. Zipwire does this with a small set of rules designed so that neither side quietly loses out.

## The short version

* A half-day unit that is **at least 55% worked** is billed in full (an hourly unit needs **70%**). Starting a unit and doing most of it counts.
* Time you work **beyond** what's billed isn't lost — it goes into a **running balance**.
* When the balance adds up to a **whole unit**, it pays for an allowed unit that didn't bill.
* The balance first has to **pay back** any earlier round-ups, so the client is never charged twice for the same gap.
* Units the plan doesn't allow are **never billed**, and days nobody worked are **never billed**.

## Rule 1: Nearly-done units round up

Each day, the minutes you journalled fill that day's units in order. If an allowed half-day unit is at least 55% worked, it bills in full. Hourly units are tighter, because a few minutes is a bigger share of an hour, so they need 70%.

| Unit length                          | Work needed to bill the unit |
| ------------------------------------ | ---------------------------- |
| 1 hour                               | 42 minutes                   |
| Half-day on an 8-hour plan (4 hours) | 2 hours 12 minutes           |
| Half-day on a 7-hour plan (3½ hours) | 1 hour 56 minutes            |

This is a deliberate courtesy to the contractor. Someone who works a solid three-hour morning bills the half-day, not 75% of one.

## Rule 2: One running balance across the sheet

Zipwire walks through the sheet from the first day to the last, keeping one balance in minutes:

* Every minute **worked** adds to it.
* Every unit **billed** takes its whole length away from it.

A round-up therefore pushes the balance **below zero** — that's the part of a unit the client paid for but nobody worked. Overwork pushes it **above zero**.

When the balance covers a whole unit, Zipwire bills one of that day's allowed units that didn't bill on its own. It only does this while the balance covers a **whole** unit. Leftover minutes never round up by themselves; only real work inside a unit earns the 55% round-up.

{% hint style="info" %}
**What this means in practice** Billed time can only exceed worked time by the round-ups given along the way, and later overwork pays those round-ups back before anything extra is billed.
{% endhint %}

## Rule 3: The plan sets the limits

* **Units marked NA are never billed.** If you work past your day's allowance, the extra time still counts — it goes into the balance — but it can only ever pay for an *allowed* unit.
* **Days with no allowed units** (for example, a weekend marked NA) are outside the plan. Work on them doesn't add to the balance or take from it.
* **Days nobody worked are never billed.** Banked overwork can't turn an idle day into a billed one.

## Rule 4: What's left at the end

After the last day, if there's still enough balance for a whole unit, it goes to an allowed, unbilled unit on a day that had work. Zipwire picks the **cheapest unit for the client first**, then the earliest day on a tie.

Anything smaller than a unit that's still left over is time worked for free. It rounds **down**.

## Worked examples

All examples use an 8-hour plan with half-day units (4 hours each) and two half-days allowed on weekdays.

{% tabs %}
{% tab title="A normal week" %}

| Day | Worked | Billed                                      | Balance after                                        |
| --- | ------ | ------------------------------------------- | ---------------------------------------------------- |
| Mon | 7h     | 2 half-days (second one is 75% — rounds up) | −1h                                                  |
| Tue | 9h     | 2 half-days                                 | 0 (Tuesday's extra hour paid back Monday's round-up) |
| Wed | 5h     | 1 half-day (second one is only 25%)         | +1h                                                  |
| Thu | 8h     | 2 half-days                                 | +1h                                                  |
| Fri | 7h     | 2 half-days (second one rounds up)          | 0                                                    |

**36 hours worked, 9 half-days (36 hours) billed.** The round-ups on Monday and Friday were balanced out by the extra time on Tuesday and Wednesday.
{% endtab %}

{% tab title="A long day, then a short one" %}

| Day     | Worked  | Billed                                                                            |
| ------- | ------- | --------------------------------------------------------------------------------- |
| Mon     | 12h     | 2 half-days — the extra 4 hours can't bill on Monday, so they go into the balance |
| Tue     | 4h      | 2 half-days — one from the work, one paid for by Monday's balance                 |
| Wed–Fri | 8h each | 2 half-days each                                                                  |

**40 hours worked, 10 half-days billed.** Nothing was billed that the plan doesn't allow on its day.
{% endtab %}

{% tab title="A long day, then nothing" %}

| Day     | Worked | Billed      |
| ------- | ------ | ----------- |
| Mon     | 12h    | 2 half-days |
| Tue–Fri | —      | nothing     |

**12 hours worked, 8 hours billed.** The extra 4 hours can't be billed on Monday, and idle days can't be billed, so those 4 hours are worked for free.
{% endtab %}

{% tab title="Short days" %}

* **Twenty 3-hour days** bill one half-day each: 20 half-days for 15 hours worked. Each day earns its own round-up.
* **A single 2-hour day** with nothing else on the sheet bills nothing. That's 50% of a half-day, just under the half-day bar, and there's no balance to make up the rest.
  {% endtab %}
  {% endtabs %}

## Why it's fair to both sides

| For the contractor                                                    | For the client                                                             |
| --------------------------------------------------------------------- | -------------------------------------------------------------------------- |
| A unit that's mostly done is billed in full                           | Round-ups are paid back by later overwork before anything extra is billed  |
| Overwork isn't lost — it can pay for an allowed unit that didn't bill | Only whole units are bought from the balance; partial leftovers round down |
| Time worked past the day's allowance still counts                     | NA units, NA days and idle days are never billed                           |
|                                                                       | Leftover balance goes to the cheapest units first                          |

## Worked vs billed, before you send

On the **Ready** tab, senders see a line comparing time worked with what will be billed, for example:

> Worked 37h 20m = 9.3 hd; billing 9 hd = 36h; 1h 20m not billed

This line is only shown to the sender. Approvers and processors see the billed units, not the comparison.

{% hint style="warning" %}
**Bills are worked out when the sheet is created** The rounding is applied when a sheet is created and doesn't change afterwards. A sheet must use one unit length throughout, so a period that mixes hourly and half-day plans, or plans with different standard hours, can't go on one sheet.
{% endhint %}

## Related Resources

{% content-ref url="/pages/V6ToCyYJtjSrCKJbuDcw" %}
[Billing Plans](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/billing-plans.md)
{% endcontent-ref %}

{% content-ref url="/pages/HMQINGP6nnIrp2MV6EP0" %}
[Rate Plans](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/rate-plans.md)
{% endcontent-ref %}

{% content-ref url="/pages/P1oSNNJGnWqncV3gLSln" %}
[Timesheets](https://docs.zipwire.io/zipwire-approve/unboxing-key-concepts/timesheets.md)
{% endcontent-ref %}

{% content-ref url="/pages/MYeIi6u2vsxqN4Mw0l4z" %}
[Understanding invoicing](https://docs.zipwire.io/zipwire-approve/understanding-invoicing.md)
{% endcontent-ref %}
