How Time Becomes Billed Units
How Zipwire turns the time you journal into whole billed units — the round-up, the running balance, and why the result is fair to both the contractor and the client.
Contractors work in minutes, but clients are billed in units — hours or half-days, as set by the Billing Plan. Somewhere, real time has to be rounded into whole units. Zipwire does this with a small set of rules designed so that neither side quietly loses out.
The short version
A half-day unit that is at least 55% worked is billed in full (an hourly unit needs 70%). Starting a unit and doing most of it counts.
Time you work beyond what's billed isn't lost — it goes into a running balance.
When the balance adds up to a whole unit, it pays for an allowed unit that didn't bill.
The balance first has to pay back any earlier round-ups, so the client is never charged twice for the same gap.
Units the plan doesn't allow are never billed, and days nobody worked are never billed.
Rule 1: Nearly-done units round up
Each day, the minutes you journalled fill that day's units in order. If an allowed half-day unit is at least 55% worked, it bills in full. Hourly units are tighter, because a few minutes is a bigger share of an hour, so they need 70%.
1 hour
42 minutes
Half-day on an 8-hour plan (4 hours)
2 hours 12 minutes
Half-day on a 7-hour plan (3½ hours)
1 hour 56 minutes
This is a deliberate courtesy to the contractor. Someone who works a solid three-hour morning bills the half-day, not 75% of one.
Rule 2: One running balance across the sheet
Zipwire walks through the sheet from the first day to the last, keeping one balance in minutes:
Every minute worked adds to it.
Every unit billed takes its whole length away from it.
A round-up therefore pushes the balance below zero — that's the part of a unit the client paid for but nobody worked. Overwork pushes it above zero.
When the balance covers a whole unit, Zipwire bills one of that day's allowed units that didn't bill on its own. It only does this while the balance covers a whole unit. Leftover minutes never round up by themselves; only real work inside a unit earns the 55% round-up.
Rule 3: The plan sets the limits
Units marked NA are never billed. If you work past your day's allowance, the extra time still counts — it goes into the balance — but it can only ever pay for an allowed unit.
Days with no allowed units (for example, a weekend marked NA) are outside the plan. Work on them doesn't add to the balance or take from it.
Days nobody worked are never billed. Banked overwork can't turn an idle day into a billed one.
Rule 4: What's left at the end
After the last day, if there's still enough balance for a whole unit, it goes to an allowed, unbilled unit on a day that had work. Zipwire picks the cheapest unit for the client first, then the earliest day on a tie.
Anything smaller than a unit that's still left over is time worked for free. It rounds down.
Worked examples
All examples use an 8-hour plan with half-day units (4 hours each) and two half-days allowed on weekdays.
Mon
7h
2 half-days (second one is 75% — rounds up)
−1h
Tue
9h
2 half-days
0 (Tuesday's extra hour paid back Monday's round-up)
Wed
5h
1 half-day (second one is only 25%)
+1h
Thu
8h
2 half-days
+1h
Fri
7h
2 half-days (second one rounds up)
0
36 hours worked, 9 half-days (36 hours) billed. The round-ups on Monday and Friday were balanced out by the extra time on Tuesday and Wednesday.
Mon
12h
2 half-days — the extra 4 hours can't bill on Monday, so they go into the balance
Tue
4h
2 half-days — one from the work, one paid for by Monday's balance
Wed–Fri
8h each
2 half-days each
40 hours worked, 10 half-days billed. Nothing was billed that the plan doesn't allow on its day.
Mon
12h
2 half-days
Tue–Fri
—
nothing
12 hours worked, 8 hours billed. The extra 4 hours can't be billed on Monday, and idle days can't be billed, so those 4 hours are worked for free.
Twenty 3-hour days bill one half-day each: 20 half-days for 15 hours worked. Each day earns its own round-up.
A single 2-hour day with nothing else on the sheet bills nothing. That's 50% of a half-day, just under the half-day bar, and there's no balance to make up the rest.
Why it's fair to both sides
A unit that's mostly done is billed in full
Round-ups are paid back by later overwork before anything extra is billed
Overwork isn't lost — it can pay for an allowed unit that didn't bill
Only whole units are bought from the balance; partial leftovers round down
Time worked past the day's allowance still counts
NA units, NA days and idle days are never billed
Leftover balance goes to the cheapest units first
Worked vs billed, before you send
On the Ready tab, senders see a line comparing time worked with what will be billed, for example:
Worked 37h 20m = 9.3 hd; billing 9 hd = 36h; 1h 20m not billed
This line is only shown to the sender. Approvers and processors see the billed units, not the comparison.
Related Resources
Billing PlansRate PlansTimesheetsUnderstanding invoicingLast updated